A 24/7 plastics plant in an industrial park (DR): shifting load to off-peak hours pays for the project in under a year — a finding from our own monitoring.
Energy was the second-largest expense of Dominican free zones in 2025 (RD$7.26 billion, +13.2% per elDinero/ADOZONA). We measure it machine by machine, line by line, and turn it into a cost your plant management can actually manage.
With some of the region’s highest tariffs, every wasted kWh competes directly against your cost position versus other countries.
The utility meter gives a total; your product costing needs the detail only circuit-level measurement delivers.
Motors and compressors degrade power factor — and the penalty shows up month after month.
Gradual degradation of major equipment goes unnoticed until the bill shouts it.
Headquarters and international brands ask for energy and footprint data that is hard to produce today.
What stays on between shifts and weekends is the most common waste we find.
All with Eniscope in your panels, with management-grade reports: kWh, US$ and cost per unit.

A 24/7 plastics plant in an industrial park (DR): shifting load to off-peak hours pays for the project in under a year — a finding from our own monitoring.
Yes. Sensors are installed in panels in coordination with your maintenance team, typically over 2 to 3 days and without a line stop.
Yes, even more so: at medium voltage, billed demand and power factor weigh more, and internal measurement is the only way to manage them before they hit the bill.
Yes. Circuit-measured data feeds energy and footprint reporting with traceability by area and period — no estimates.
Start with the free bill review and know within days whether you are paying removable surcharges.