Real stories from our clients in the Dominican Republic, drawn from our own reports. We publish names only with the client's written permission; meanwhile, the sector and the figures speak for themselves. And the best signal of all: several of these programs began as pilots the client chose to expand.
The first saving verified against a baseline
Cruise terminal · Dominican Republic
At a cruise terminal, measurement exposed a water-system leak: the osmosis and pumping circuit fell from 697 to 211 kWh/day once fixed and left the peak window (35 kW to under 1 kW) — a saving verified against the baseline. And the project keeps monetizing: pool VFD trials (−58% on that system) were identified as the next opportunity, worth ≈US$26,000 more per year.
Camp David Ranch: switching off what nobody saw
Hotel & restaurant · Santiago
At our own hotel, circuit-level visibility showed A/C units and extraction hoods running out of hours. Just switching those assets off — zero investment — cut consumption 4%. The at-home validation of the model we now apply to every client.
12 days to put a number on the invisible
Free-zone textile park
In under two weeks of measurement, an industrial building went from zero visibility to quantifying its out-of-hours consumption: 22.7% of the panel’s energy. Over half came from a single unlabeled breaker that turned out to be a system chilling water out of hours — adding absolutely nothing to the operation. That building was the paid pilot: the project is now expanding to the operation’s remaining buildings, with compressors as the next opportunity (an additional US$22–37k/yr).
Compressors, chillers and a leak nobody saw
Manufacturing plant
Our team’s diagnostic with IBA at an industrial plant revealed three fronts: a compressor running near full load all the time, with no regulation; chillers with setpoints and loads to optimize; and an oil leak in the main transformer that could fail at any moment, putting the whole supply at risk. The consumption profiles turned each finding into a concrete action — and the plant, which was the pilot, opened the door: the project is now expanding to the group’s other operations.
A measure package that pays back in 7 months
International chain restaurant
Audit + 5 months of Eniscope data at an international franchise restaurant. The star finding: the line water heater, responsible for 41% of equipment cost — scheduling it alone saves US$7,215/yr with a 2-month payback, and converting it to gas US$23,448/yr. The full package: US$68,443/yr with an average 0.6-year payback.
The cooling that works the night shift
Food distribution
At a distribution center, refrigeration concentrates 72% of consumption and the overnight base load equals 79% of a full working day. The one action that applies to any refrigerated warehouse: on-demand defrost and fans off when the compressor is idle — up to 15% of refrigeration consumption with under-2-month payback. The full roadmap targets 30–45% savings, validated measure by measure with Eniscope.
The shared meter nobody could reconcile
Airport logistics
At an air-cargo warehouse, circuit-level measurement cleared up years of discrepancies with the airport’s meter: it identified tenant consumption bypassing the meters and lighting running 24/7 that explained about 45% of the spend. The client summed it up in writing — the system "regularized the electricity consumption situation" — and the group moved the program to another of its units.
The A/C that switched on for shifts that no longer exist
Office building · Santiago
A corporate building with climate controllers well configured… for schedules from years ago: whole units fired up every weekend for shifts that no longer existed, with not one person in the offices. Circuit-level visibility exposed it in the weekly reports, and the client now runs with consumption watched week by week.
Healthcare: the program in the making
Private hospital · Santiago
A leading private hospital chose to start with a monitoring pilot. The experience won them over: the operations team now knows which systems to focus on to hunt savings actions, and the program is expanding across the whole hospital. 24/7 HVAC, critical equipment and zero room for interruption: where continuous measurement is worth the most.
The same technology, proven in every sector
Results published by Best.Energy and the partners of the global network Boost belongs to. They are not Boost clients: they show what Eniscope achieves in operations like yours.
KFC
QSR (Malaysia). Average savings across the chain — up to 40% in some stores. The pilot delivered 24% and beat every tendering supplier.
Read the full case →
Starbucks
Coffee / retail (India). Automating the A/C removed human error: a single store saves over US$5,000 a year, with a 4-month payback.
Texaco
Gas stations (Honduras). Sustained savings at the pilot and US$116,000 across the 5-year contract; optimized A/C reached −33%.
Read the full case →Telefónica
Telecommunications. 28 Eniscopes and 224 circuits centrally monitored at the world’s 7th-largest telco.
7-Eleven
Convenience (Denmark). 2.7 million kWh saved across the network. At the model store: −12.9% with a 19-month payback, using only low- or no-cost measures.
Read the full case →Hospital Fátima
Healthcare. Verified savings at a network hospital: HVAC and critical equipment under continuous monitoring.
Metal foundry
Manufacturing (Brazil). 12-month ROI and −28.6% in cast-metal production cost. Measurement exposed the process waste.

Bethune-Cookman
University (Florida). A problem undiagnosed for 5 years, found in 4 weeks with Eniscope — and fixed at zero cost.
Safeway
Supermarkets (Canada). CUES on the refrigeration compressor: −12% measured over two weeks and a 3-month payback.
Crvena Jabuka
Retail / Supermarkets. Supermarket chain: refrigeration and HVAC compared store by store from a single platform.
Hotel chain
Hotels (East Africa). Hotel group in Kenya: A/C and common areas optimized with Eniscope data, without touching the guest experience.
Hillsborough Schools
School district (Florida). Published projection of annual savings on the district’s electricity budget after the Eniscope rollout.
Source: cases published by Best.Energy (global network). Figures as per each original publication.
Network cases, told on video
Produced by Best.Energy with the global network's clients. The same results we install here, seen in real operation.
7-Eleven, Denmark — convenience
Mövenpick Hotel — hospitality
Tex Plastics, UK — manufacturing
Your operation could be the next case
Start with the free bill review and let's build the result together.