kWh (kilowatt-hour)
The unit of consumed energy: a 1,000-watt device running for one hour consumes 1 kWh. It is the main unit your utility bill charges.
kW (kilowatt)
The unit of power: how much energy a device demands at an instant. Bills charge energy (kWh) and, under demand tariffs, power (kW) as well.
kVA (kilovolt-ampere)
Apparent power: the combination of useful power (kW) and reactive power (kVAR). Transformers and generators are sized in kVA.
kVAR (reactive energy)
The energy motors, compressors and transformers need to create magnetic fields, producing no useful work. In excess, it degrades power factor and triggers bill surcharges.
Power factor
The ratio between useful power (kW) and apparent power (kVA), from 0 to 1. In the Dominican Republic, a power factor below 0.90 triggers a reactive energy surcharge under SIE regulations.
Peak demand
The highest power (kW) your facility reached in the billing period. Under demand tariffs, that peak defines part of what you pay — even if it lasted minutes.
Billed demand
The demand the utility charges you each month. Under some tariffs it is set by historical peaks: if your operation shrank and nobody reviewed it, you may be paying for demand you no longer use.
BTS, BTD, MTD tariffs
Dominican tariff classes: BTS (simple low voltage), BTD (low voltage with demand) and MTD (medium voltage with demand), each with variants. The right tariff depends on your voltage, demand and consumption pattern — the wrong one costs money every month.
Load factor
The ratio between your actual consumption and what it would be at constant peak demand. A low load factor usually means expensive peaks and unused capacity.
THD (total harmonic distortion)
How much the electrical waveform is deformed by non-linear loads (drives, UPS, LED). High THD causes heating, nuisance trips and premature equipment aging.
Energy baseline
The model of what your operation would consume without savings measures, built from history and its driving variables (production, occupancy, weather). All verified savings are measured against it.
IPMVP
The International Performance Measurement and Verification Protocol: the global standard for proving with data that energy savings are real. It defines how baselines are built and adjusted for operational changes.
ASHRAE energy audit
The formal facility diagnosis per ASHRAE levels: Level 1 (preliminary), Level 2 (measured analysis with costed measures) and Level 3 (detailed engineering for major investments).
Submetering
Measuring inside the facility — per circuit, asset or area — instead of relying only on the utility meter. The foundation of any serious energy management.
Phantom / out-of-hours consumption
Energy consumed while the operation is closed: equipment nobody switched off, HVAC without occupancy, compressed air leaks. The most common waste and the cheapest to eliminate.
Payback
The time an investment takes to recover itself through the savings it generates. A capacitor bank costing US$5,000 that saves US$850 monthly has a 6-month payback.
ESCO
An energy services company that implements savings projects, sometimes paid on performance. Serious performance contracts require independent IPMVP verification.
BMS (building management system)
The system controlling a building’s HVAC, lighting and equipment. It complements monitoring: the BMS controls, independent measurement verifies.